What you get
- A device layout with every sign, cone, taper and buffer.
- Every dimension cited to the MUTCD table it came from, with your agency's own numbers where they differ. Seventeen agencies are encoded.
- A pedestrian route drawn where a sidewalk closes.
- A signed detour, checked for the largest vehicle you name.
- A PDF for tabloid paper, and the CAD file if you want it.
- Quick revisions, drawn again from the same inputs.
What your TCPs are not
It is not a permit, and it is not an approval
Your agency decides whether a plan is acceptable.
It carries no professional engineer's seal unless you add one
Some jobs need a sealed plan. Ask your permit counter whether yours does, and add the seal to your order if it does.
It is a DRAFT until we issue it
A draft is stamped DRAFT. An issued sheet is stamped ISSUED FOR CONSTRUCTION, with the date.
The field has the last word
Dimensions and detours are verified in the field before a sign goes up.
How we check every number
The drawing is computed from the manual's tables at your posted speed, not sketched and not generated by a language model. Where your job falls outside what the chosen figure covers, the sheet refuses to be issued and prints the mismatch. Then a person reads every warning before the sheet is sent.
Some agencies want the plan on their own base map. Seattle says so in its Traffic Control Manual, at 2024 TCM p. 41. Where yours does, we draw the layout on it.
How your order goes
- Order in the portal. Sign in, and the order form asks in plain words. Attach your plans and specs.
- Pay the quoted price. We send the quote to the portal before any work starts.
- Review and download your TCPs there. Then submit them to your agency.